|
|
||||||||||||||||
|
||||||||||||||||
|
||||||||||||||||
![]() |
ENGINEERING Andrew P. (Chip) Fontaine, P.E., Town Engineer Frank S. Lagrotteria Building Office Hours: Phone: (781) 337-5100, x 316 RESPONSIBILITIES: The DPW Engineering Division designs infrastructure improvement projects such as new water mains installations, cleaning and lining of water mains, storm drain system improvements, sanitary sewer system extensions, seawall repairs, roadway and intersection design, and other public works projects. Staff provides construction inspection of public works projects and subdivision developments. Land surveying is conducted to support town projects, requests from other town departments, and resident requests for street line location (on public ways). Technical support is provided to all Public Works divisions and town departments upon request. Projects are reviewed as part of Special Permit/Variance Applications, Subdivision Approval, and Building Permit applications. Building address numbers are assigned here during the building permit process or as otherwise required.
Zoning Map 2004 PDF File 3.12MBs Records kept on file include deeds, plot plans, recorded plans, microfilm records, survey field books, and various plans that have been produced by or provided to the division over the years. Copies of plans and other documents on file are available for fees ranging from $0.50 (8½" x 11") to $7.00 (36" x 50") per print. Research time is billed at $4 per 15 minutes. FREQUENTLY ASKED QUESTIONS: Q: Does the Engineering Division have a copy of my plot plan on file? Q: Where can I get a copy of my deed? Q: Can the Engineering Division locate my property line? |
Featured DPW Links: |
||||||||||||||
|
|
||||||||||||||||