Fee Schedule

Type of Application
Base Rate
Plus Density Increase
Plus DPW Plan Review
Approval Not Required (ANR) - Form A Plan
 
Original plan and 2 copies
$100

 

$150 per newly created buildable lot.

Applies to all application types: 

  • $200/lot for lots ≤ 25,000 SF, 1 set of utility services.
  • $300/lot for lots > 25,000 SF, ≤ 50,000 SF, 1 set of utility services.
  • $400/lot for lots > 50,000 SF, ≤ 100,000 SF, 1 set of utility services.
  • $500/lot for lots > 100,000 SF, 1 set of utility services.
  • $100/lot for each additional set of utility services.
  • 20% of fee for each resubmittal, including resubmittal to incorporate DPW comments.

Above fees may be reduced by 50% for projects that do not involve the construction of a new, habitable, complete building/structure (additions, sheds, decks, pools, etc.) AND involve no utility work.

Preliminary Subdivision - Form B Plan
 
Original Plan and 9 copies plus certified list of abutters
$300
$1.00 per centerline foot of roadway over 300 ft.
Definitive Subdivision - Form C Plan
 
Original plan and 9 copies, certified List of Abutters, and a reduction of the original plan to 11 x 17 paper.
 
The applicant will be billed directly from the newspaper for the cost of the legal advertisement for the public hearing notice.
$600.00
 
The definitive fee is minus preliminary fee, if filed within 7 months of the preliminary plan.
$100.00 per lot and $1.00 per centerline foot of roadway over 300 ft.
 
Additional charges are based on acreage, square footage, and/or roadway centerline.
Roadway Conditions
 
$150