Memorial bench restored and decorated with new plantings 2-5 play structure assembled (60% accessible by ramps) 5-12 play structure and swing set being assembled 5-12 play structure assembled Overgrowth cut back (daylighted) Walking path extended past bleachers and dugouts Walk path connected to street hockey court (new fencing) Sign installed at park's eastern entrance Sign installed at park's eastern entrance Swing set assembled (three bays) Preparing to extend walking path from hockey court to park's eastern entrance Installing the walking path to the eastern entrance